Total actiivties time

『 更新时间:2008-8-28 』『 字体:变小 变大 』『 作者:佚名 | 来源:SAP网络

SAP相关内容

I have a scenario where i have to capture the total time for the activities (machine hrs)for a material.

For e.g
If i am manufacturing a car.Chasis,engine and gearbox are the 3 main components.and below this lots of assemblies are present so how do i get the cummulative activity time.




Use tcode co28 and choose op/sub ops and enter one of the profile and order number or material.

select the operations as a block and goto fields icon.

select the fields you want ex confirmed activity 2 (machine time) /workcenter/op
qty and then enter.

Your confirmed activities time the operations will be displayed.

Now you place the cursor on confirmed activities and goto summation by
choosing the symbol sigma.

You will get the total confirmed activities time for that production orders.

【点击数:】【发表评论】【加入收藏】【打印此文】【关闭窗口
  • 上一篇文章:
  •  
  • 下一篇文章:
  • 推荐本文赚点券

    SAP搜索

    Google

    关文章

    您的姓名:
    评分等级:
    1分 2分 3分 4分 5分
    评论内容:
    1、严禁发表危害国家安全、政治、黄色淫秽等内容的评论。
    2、用户需对自己在使用释怀网服务过程中的行为承担法律责任。
    3、本站管理员有权保留或删除评论内容。
    4、评论内容只代表网友个人观点,与本网站立场无关。
    SAP网
    个人网站,提供sap资源下载及查询,所有资源均来自网络,如你认为有侵权,请通知我
    返回网站顶部